the project

Renovation featuring Inpro Washroom Systems, Door + Wall Protection, and Elevator Interiors.

Contractor: JP Cullen Madison, Wisconsin

Interior Designer/Specifier: Tracie Dunham, NCIDQ - Facility Interior Designer, VA Madison

Inpro® Products Used

Washroom Systems

  • BioPrism® Solid Surface Decorative Panels 6” x 24” Horizontal Pattern in Bright White
  • BioPrism Solid Surface Wall Cladding Smooth Panels in Natural Linen

Door + Wall Protection

  • BioPrism® Solid Surface Decorative Panel Wall Cladding
  • Model 2000W Handrails in Hazelwood with stainless steel brackets
  • Model 1800 Wall Guard in Monterey
  • Palladium® Rigid Sheet
  • High Impact Corner Guards in Monterey

Elevator Interiors

  • Custom Aspex® Printed Wall Protection for the elevator back panels
  • Side Elevator Panels in Brushed Silver

The Project
Ongoing, multi-phased renovation projects. The current phase of the 3B EN area covers 10,000 sq. ft. – including 16 patient rooms and corridors – with a budget of $5.6M. Previous projects included elevator interior renovations and the installation of door and wall protection products.